
Private gated eco-village · In Antigua Guatemala
Own land in Antigua.Build the life you want,at your own pace.
Five private homesites and shared productive green space in San Pedro Las Huertas, Antigua Guatemala — about 20 minutes from the historic center.
- 5
- homesites
- $120,000
- from
- ~20′
- to Antigua
- 30%
- down, from
In Antigua. Far from the noise.
In Antigua.Far from the noise.
Wake up to mountain air, birds and room to grow — without giving up Antigua's cafés, culture and community. Camino 5 is small by design: private land, shared green space and neighbors who value a lighter footprint.


Why it feels different
A small place, on purpose.
- 015
Only five homesites
A limited community. More privacy, more say in how the place grows.
- 02~20′
Around 20 minutes from central Antigua
Close enough for the market and dinner, far enough for real quiet.
- 031,350 m²
of shared productive land
An organic garden, coffee and fruit trees, compost and common green space.
- 04∞
Build at your own pace
Secure the land now. Plan and build the home when the timing is right.
A walk through the place
The land is the starting point.
Real photography from the site and the survey. The home is a possibility; the land is what you buy.


Room to breathe, grow and slow down.
Twenty minutes from everything you love about Antigua.
The masterplan
Designed from the garden outward.
The plan keeps the scale intimate and gives the shared landscape the center. Three standard lots, one lot with a home already built, one premium lot, and a shared green area — organized along a single interior road.
- Standard lot
- Lot 1 · land + home
- Premium lot
- Shared green space
Illustrative site plan. Dimensions follow the technical survey; commercial availability is confirmed before reserving.

What you can buy
Choose the amount of land that fits your plan.
Current availability is five private lots. Availability and price are confirmed before you reserve.
Standard homesite
3 · 299.5 m²
Room for a garden, a compact home and future flexibility. Secure it now and choose when and how to build.
- Lot 2Available
- Lot 3Available
- Lot 4Available
Lot 1 · house already builtLand + home
Lot 1 · 299.5 m²
Lot 1 comes with the first home already built on site. Move in sooner, or use it as a base while you plan the rest.
Prices and availability are subject to confirmation and final contract terms.
Availability verified · Sep 19, 2026
Also available
Prefer the whole property?
The entire farm — a completed off-grid home on ~3,548 m² of fenced land — is also for sale as one.
Entire property
$475,000
The shared landscape
Green space you can actually use.
Camino 5 is organized around a productive shared landscape — not decorative planting. It is the reason the community stays small.
of shared productive land
- 01
Organic garden
Vegetables, herbs, flowers and seasonal planting for the whole community.
- 02
Trees & harvest
Coffee, avocados and fruit trees already growing on the land.
- 03
Shared systems
Composting, green walls and solar lighting — planned around the garden.

Financing
A clearer path to owning the land.
Owner financing may be available, subject to final terms. Payments follow the balance you still owe, so the first month is the highest and each month gets lighter.
- 30%
- Minimum down
- 5 years
- Up to
- 3–6%
- annual interestthe more you put down, the lower the rate
- ↘
- Declining paymentsnot a fixed monthly fee
Estimate your payments
Move the sliders to see how the land could be financed. These are estimates for planning, not an offer.
Your rate depends on your down payment — the larger the down payment, the lower the rate. The exact rate is confirmed in writing.
- Your rate
- 6.0%
- Amount financed
- $84,000
- First payment
- $1,820
- Last payment
- $1,407
- Estimated total interest
- $12,810
- Total paid
- $132,810
How the monthly payment declines
Each bar is one month: fixed principal plus interest on the falling balance.
Estimates only, rounded for clarity. Final amounts, eligibility and terms are defined in the written agreement and subject to approval. Camino 5 does not provide financial, tax or legal advice.
The eco-village systems
Mountain living, without isolation.
The goal is practical independence, supported by infrastructure that makes everyday life easier. Here is the honest status of each piece — what is done, underway, or planned.
Perimeter
By the projectThe property is fenced; the perimeter will grow into a living green wall.
Interior road
By the projectA 7 m wide, 150 m long interior road connecting the five lots and the shared garden.
Gate & entry
By the projectControlled access at the entrance of the private community.
Biodigester
Per homeOn-site wastewater treatment for lower-impact living.
Rainwater capture
Per homeRainwater capture designed into each home's systems.
Gas hot water
Per homeGas water heating already installed for reliable everyday hot water.
Solar power
Per homeAn off-grid solar system per home — battery bank and inverter.
Access road
By the projectThe mountain access road is being finished with cobblestone paving.
Orchard & coffee
By the projectCoffee, avocados and fruit trees already growing; the garden expands over time.
Green wall
By the projectLiving perimeter planting for privacy that grows into the landscape.
Composting
By the projectCommunity composting that feeds the productive garden.
Public power
By the projectWorking with neighboring residents to extend the public electrical line to the area.
Solar lighting
By the projectShared low-impact lighting along the road and common areas.
Municipal water
By the projectBringing a municipal water connection to the community is planned.
Designed for resilient, lower-impact living. While water, power or any critical system is still being finished, we describe it exactly as it is today — never as fully off-grid and operational.
Availability verified · Sep 19, 2026On the ground
Work happening right now.
Camino 5 is being built in the open. Here is real progress from the land — the road, the perimeter, the garden and the systems taking shape.
Actual photography from the site. We add updates as the work advances.
Build at your pace
The home is yours to design.
You buy the land and design your own home — with your own architect or ours. We keep our role in construction to a minimum, so the house is truly yours. Below is one reference design to start from.

A first floor to start from
The reference design begins with a simple first floor, thought out for cooking, working, hosting and everyday low-impact living. Take it as a starting point, adapt it, or design something entirely your own.
- Kitchen and dining area
- Living room connected to the garden
- Study for remote work, reading or guests
- Guest half-bath plus a full bath
- Practical circulation for compact living


Camino Nest
A reference design — for couples, small families, guests or remote work
- 2 bedrooms
- 1 study
- Walk-in closet
- Bathroom
- Battery area
Or design your own
Bring your own architect, or work with ours
Beyond this reference, each owner designs and builds their own home within the community's simple design guidelines. We build as little as possible — the house is yours.
Buying from abroad
A clear buying process, even when you are abroad.
This part matters most. The steps below reduce risk without pretending the process is instant. Your own attorney reviews everything before you fund.
- 01
Review availability, documents and financing
We share current lots, written terms and what your attorney can review.
- 02
Walk the land by live video or in person
See the views, the garden, the access and the orientation of each lot.
- 03
Choose the homesite and receive written terms
Confirm the lot, the price and the next steps in writing.
- 04
Complete independent legal & title due diligence
Your own attorney or notary reviews ownership, title and the agreement.
- 05
Sign and fund according to the final agreement
Move into design and construction on your own timeline.
What your attorney can review
- Owner / seller identity
- Registry certification the attorney authorizes to share
- Survey plan and measurements
- Community bylaws (reglamento de condóminos)
- Status of permits and infrastructure
- Draft promise-of-sale / purchase agreement
- Process for funds coming from abroad
Sensitive documents are shared during due diligence — not published in full.
Guatemala's Foreign Investment Law recognizes foreign investors' rights to use, benefit from and own property on equivalent terms to Guatemalan citizens (per the U.S. Department of State). Camino 5 is not a law firm and does not give legal advice — we recommend independent legal and title review.

The family behind Camino 5
Built close to home — because this is our home, too.
Camino 5 is a family project. We live a few steps from the land and built the first home ourselves. We chose more sustainable systems because we wanted to live with them, not just sell them. When you visit, you meet the people behind the project.
— The family at Camino 5
See it in motion
A slow walk across the land.
No filters, no staging — just the terrain, the trees and the valley, the way you'll see it when you visit.
Honest answers
The questions buyers actually ask.
Where exactly is Camino 5?
In San Pedro Las Huertas, Sacatepéquez, around 20 minutes from central Antigua. We share the precise location and the access video once we've spoken, for the security of the community.
How long does it take to reach Antigua?
Around 20 minutes by car to central Antigua and about 10 minutes to Supermercado La Torre, via RN-14. Times depend on traffic and route.
What is included with the land?
You buy the land, plus access to the shared productive green space and the community systems as they are completed. A home is not included in the land price.
Is a house included in the advertised price?
No. The advertised prices are for land. Camino Nest is a conceptual reference design you can build later, or you can bring your own architect. We keep our role in construction to a minimum — you design and build your own home.
Which infrastructure is complete today?
The perimeter fence, the interior road and the controlled gate are in place, and each home's solar power, gas hot water, rainwater capture and biodigester are installed. The cobblestone access road, the orchard, the green wall and composting are underway. Public power, solar lighting and a municipal water connection are planned. We keep this list honest and current.
How will water, electricity and wastewater work?
A municipal water connection is planned for the community, and we're finalizing the best water solution for the site — we'll share the current status when you enquire. Public power is being extended to the area. Each home runs on its own solar power, with gas hot water, rainwater capture and a biodigester for wastewater. We describe systems as they are today, not as a finished off-grid promise.
Can I buy if I am not a Guatemalan citizen?
Yes. Guatemala's Foreign Investment Law recognizes foreign investors' property rights on equivalent terms to citizens. We recommend you confirm everything with your own independent attorney.
How does owner financing work?
Owner financing may be available, subject to final terms: a down payment starting at a set amount, up to five years, with interest on the outstanding balance. Because payments follow the balance, they decline each month rather than staying fixed. Final terms are in the written agreement.
Can I build later or use my own architect/builder?
Yes. Secure the land now and build when the timing is right, within the community's design guidelines. You can use our concepts or your own team.
Are there community design rules?
Yes. Community bylaws keep the scale, the shared landscape and the character consistent. Your attorney reviews them before you reserve.
What are the monthly fees?
A shared maintenance fee supports the common areas and systems. The exact amount is being finalized and confirmed in writing before you reserve — we won't quote a number we can't stand behind.
Can I visit virtually before traveling?
Yes. We'll walk the land with you over live video, and share the access route and orientation of each lot, before you travel.
What documents can my attorney review?
Owner identity, the registry certification we're authorized to share, the survey plan, community bylaws, permit and infrastructure status, and the draft agreement — during due diligence.
What is the estimated development timeline?
The land is available now. Shared systems are completed in phases. We share the current status of each system when you enquire, and we don't promise an exact delivery date.

The next step
Walk the landbefore you choose it.
Tell us what you're looking for and we'll send current availability, financing options and the best way to visit — in person or by live video.



